The resiliency project began in September 2020 and is expected to last 16 months, Zeigler wrote in an email. The resulting plan should address courses of action, with time frames, for land subsidence, sea-level rise, groundwater change, coastal flooding, storm surge and stormwater management at the academy.
The Link LonkMay 04, 2021 at 06:41PM
https://ift.tt/3eey88O
Naval Academy, Navy station in Annapolis could see new sea wall - Capital Gazette
https://ift.tt/2CoSmg4
Sea
No comments:
Post a Comment